Mid-term Review Crossword Puzzle

Builder: Bo Yan
Horizontales
Today which of the following sectors of the construction industry is the largest?
The parameters defining the overall extent of work to be included in a construction contract is referred to as the:
one of the 3 components of the life cycle of the built environment covered by this class
What is the name of the stone carvings dating back to the pyramids that contained the first written regulations pertaining to construction, commonly referred to as the first known building code?
From what industry does the “lean” concept stem? faster/Is Design-build project delivery faster or slower than design-bid-build project delivery?
(------) is generally an entry level job in construction management.
In design-build, the owner first selects their (------) and then their contractor.
Narrowing the field of offers through the selection of the most qualified proposers on the basis of qualifications is known as:
In which selection method is the design 100% complete?
Verticales
In advisor or agency CM, the (-----) is at risk for the project’s budget and schedule.
By what specific measurement is construction used as an economic indicator for the U.S. economy?
Who are the primary players in a construction project?
one of four distinct stages of the design process