My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

CMTE 427: Chapter 5 Assignment

Horizontales
Things such as gas, power, and communication lines
Created after layout has been selected
Making the ground level
Incidental expense
Traffic signals, signing, lighting, striping, etc.
Takes care of rain water that falls on a building
Verticales
Calculated cost of projects
Removal of a structure
Supplies water to buildings
Removes waste water from buildings
Major roadway