Outages

Horizontales
Secondary Oxygen Scavenging
Short Notice Outage Work
TSP
RT
Verticales
Begin using the deborating ion exchanger when RCS boron reaches this concentration.
When RCS Boron reaches 50 ppm consider lithium monitoring at this frequency.
At what point prior to shutdown would you collect RCS samples for boron-10 analysis.
How long prior to the outage would you ensure that temporary ventilation is scheduled to be connected in the Hot Lab
Preventative Maintenance Work Order
Insoluble activated corrosion products