My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

BCI 2018 Changes

Horizontales
BCI will move to a _____ based scheduling
Section rating ____ will override overall BCI Rating
Target 80% of branches will be ____ day inspection
Some questions you can use P&P and _____ (2 words)
Some questions will have a _______ methodology of inspection and interview questions
If you receive a Strong BCI & 1 of the 7 sections is rated _______ BCI will be adjusted to Satisfactory (2 words)
Verticales
To have this rating you must have satisfactory and/or strong in each section
BCI stands for Branch Control ______
BCI changes will begin in this month
Questions that require a memorized response
P&P questions will be sent to teammates through ____ on day of inspection