My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

ASSURANCES OVER WIND FARM

Horizontales
The company developing the wind farm is called Ocean _________ management.
The main gripe that the Fishing industry representatives have is that the process has no Identified ______ area.
The project will use ________acres of ocean and will be completed in seven years from Now.
The wind farm is proposed to be built about 11________ miles south of Long Beach, NY.
Verticales
The wind farm hopes to generate harge amounts of electricity which is calculated in ________.
The New York Public Interest Research Group, ________, is one of the top three backers of this wind farm.
The idea was first ________by LIPA, Con Edison and the New York Power Authority about eight years ago in 2008.
The main _______of this plan are scallop, squid and Mackerel fishing industries.
One fishing representative stated that the selected is heavily________.
Wind is a _______energy resource that comes from Unequal heating of earth's surface by the Sun.