My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

Laws Crossword Puzzle #1

Laws Museum Crossword Puzzle #1
Horizontales
Telegraph communication in 1883 was in ____ code
End of the Carson and Colorado Line
The highest point in elevation on the CCRR was ____ peak
Narrow gauge rail is ___ feet apart
Steam ships carried sliver ore across the ____Lake
Verticales
Manufacturer of the Death Valley #5 railcar
The Carson and Colorado RR was built to serve the _________
The _____drives the train
The station ___ was responsible for getting the mail on the train
Sliver was mined at Cerro ____
____was mined at Ryan Mining Camp
It took 3 years for the Carson & Colorado RR to reach ______depot in April of 1883