My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

Process Safety Management

Horizontales
Mechanical ___________ (MI)
An Employee Job ______________ Checklist is completed at the conclusion of unit training and testing
The purpose of a pre-startup safety review (PSSR) is to ensure that PHA and MOC action items are ___________
Procedures must be ____________ accurate
Compliance audits are required every ________ years
Piping & Instrument __________
Only the most____________ version of an operating procedure must be kept in the control rooms
Process ____________ (PHA)
_______ Management Plan (RMP)
_____________ pre-plans are required for the Tank Farm and Refinery Processing Units
A “Process Hazard Analysis and Compliance Audit Schedule” is available on ______________
Safety ______________ Systems and Interlocks 
The Safety Director is responsible for tracking process safety ___________
Employees are involved with ___________ PSM compliance audits.
Verticales
Process _______ Information (PSI)
Operating ____________ identify the consequence of deviation and the steps required to avoid deviation
CountryMark requires that PHA’s be externally _____________
Contractors must be “Safety ______” prior to performing any work within the Refinery processing units.
Positive Materials __________ (PMI)
Unit________ must have a full understanding of operating procedures.
Management of _________ (MOC)
___________ Safety Review (PSSR)
Throughout the course of the PHA, team members will risk rank safety _____________.
The intent of ___________ investigations are to serve as a learning tool from past experiences and therefore avoiding repeat mistakes
The Training __________ assist in development of and modifying operating procedures.
The goal of change management is to properly ________ risk
Inadvertent Chemical Mixing ___________
How many types of procedures are required by PSM Operating Procedure element