My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crucigrama Sopa de Letras Hoja de Trabajo
Calificar este Puzzle:
Log in or sign up to rate this puzzle.

Solar Terms

Customer Service Training
Horizontales
Other term for "Customer"
Designs are sent to the HO’s municipality for approval of
Panels are placed on the roof
At the time of meeting the customer will sign this to move forward with the project
A technician comes out to the home to assess the integrity of the roof as well as measure the roof space.
Department responsible for making appointments with the Homeowner.
"Fix" after project has passed electrical inspection.
Department that requests PTO.
When a HO gives a possible lead on another customer.
Final step after PTO received in the solar process.
Acronym for Certificate of Approval.
When a HO calls in to cancel his solar project prior to installation, you would trans to this department.
Term for money sent to the HO by MS.
Verticales
assembled from the photos and measurements taken from the site assessment
FSD is not required. However please still reach out to the financier in order to obtain one.
Individual will meet with you at your home, review your utility bill .
Objects that are used to convert DC to AC.
Final Step after PTO
Utility Company will grant after Meter is swapped.
Dept. that will do analysis to determine why saving is not being seen.